• Home
  • Software
  • Industries
  • Application Areas
  • Academic
  • Training
  • Support
  • User Community
Free Trial Buy JMP International About Us Contact News and Events Blog Resource Center
  • JMP FAQs
  • System Requirements
  • Alphabetical List of Features
  • Downloads
  • Knowledge Base
  • Books and JMP
  • Report a Problem
  • JMP Administrators
  • Find Your Serial Number or Site ID
  • Why Register JMP?
  • Register JMP

*On SAS Download site

Statistical FAQs

When calculating power and sample size, what value should be placed in the error std deviation box?

The Error Std Dev value is the same thing as the RMSE (Root Mean Squared Error) for a model. It is an estimate for the standard deviation of the residuals. This parameter is your sigma, as given in the Power Details output from a Fit Model analysis. This value can be calculated from previous data that you have collected.

 

 

 

 


FAQ # 2096
Last Updated: 2005 May 13

Browse JMP FAQs

General FAQs

Statistical FAQs


Support Documents

JMP FAQs

Knowledge Base

System Requirements

Alphabetical List of Features

Known Issues


Contact JMP Support

Report a Problem

Update a Report

support@jmp.com

919.677.8008 (US)

International Support via Worldwide SAS Offices

 
SAS | JMP is a business unit of SAS. SAS Campus Drive, Building S, Cary, NC, 27513 • Phone: 1.919.677.8000
© 2008 SAS Institute, Cary, NC, USA. All Rights Reserved. Terms of Use • Privacy Policy